THE CHALLENGE
A protective fabricated structure was required around the chillers.
The framework needed to provide a stable base and vertical protection without obstructing the equipment. The fabrication also needed a suitable industrial finish for the working environment.
- Fabricate the base framework
- Fabricate vertical box-section uprights
- Protect the chillers from movement and damage
- Apply a two-pack epoxy paint finish

